[1]
“Determination of Follow-Up Headway of Local Drivers at Urban Multilane Roundabouts in Gombe Metropolis”, Disaster Civ. Eng. Archit., vol. 3, no. 2, pp. 150–160, Sep. 2026, doi: 10.70028/dcea.v3i2.121.